Design and refurbishment of 362 bedrooms and 21 Studios.

  • -72 new kitchens
  • -5 week lead in time inclusive of kitchen design and manufacture of 72 kitchens
  • -9 week contract duration
  • -10,000m2 of new vinyl flooring
  • -City centre location with complex traffic management

Camden Court resides within the central university hub of Newcastle Upon Tyne and provided Fortis Vision with the logistical challenge of managing up to 400 tonnes of removals and deliveries each day.

Our team were given a 5 week lead in opportunity to have all architectural working drawings completed along with the manufacture of 72 full kitchens and over 2000 bedroom components.

A 9 week contract with over 100 operatives on-site at peak times, working relentlessly to create amazing homes for Unite Students.

Our scope included strip out, new kitchens, bedroom furniture, flooring, decoration and M&E. The experience of Fortis Vision’s in-house management team gave us the confidence and ability to deliver over 15000 rooms for Unite Students,  with meticulously planned delivery and removal slots for confined external working operations.

We were delighted to hand over Camden Court on time to welcome new residents to their amazing-looking, refurbished building. Impressive results for a 9 week contract. Over 100 Fortis Vision operatives were on-site at peak times, working relentlessly to create these desirable homes for Unite Students.