In-occupation refurbishment of 251 bedrooms, bathrooms and communal areas with same-day handover

Efficient. Effective. Exceptional.

Fortis Vision is extremely proud to have delivered our latest in-occupation project at Sherren House, London.

Owned and operated by Unite Students, Sherren House comprises 251 en-suite bedrooms, as well as communal areas for students enrolled at Queen Mary University.

The work included new flooring, decoration, electrical upgrade, and new fixed and loose furniture across all bedrooms, and new flooring, toilets, cisterns, basins, and showers installed in all en-suite bathrooms, creating fresh and contemporary living spaces. 

The kitchens, communal corridors, and stairwells also benefitted from complete decoration, breathing new life into the student accommodation. Finally, the Fortis Vision team installed a new energy heating management system. Each room was upgraded with Prefect IRUS controls and new electric heaters, allowing the building to be centrally controlled collating data and allowing annual energy savings of between 20% to 40%.

  • 251 bedrooms refurbished including new flooring, decoration, electrical upgrade, fixed and loose furniture
  • 251 bathroom en-suites refurbished including new flooring, toilet, cistern, basin, shelf, mirror and shower
  • All kitchens decorated, communal corridors and stairwells newly decorated and floored
  • New energy heating management system installed throughout
  • Works completed daily with same day handover allowing students to occupy in less than 10 hours
  • Seven-week programme with city location and tight logistics

Challenges we overcame

The seven-week programme saw the Fortis Vision team deliver up to two full cluster flats per day, carefully managing student expectations while working closely with the Unite Students site-based and project teams. The daily programme was broken down by the hour to allow each trade an area to work safely and swiftly, with all operatives supporting one another working in unity.

Pre-contract organisation and coordination were key to the success of this project, something we pride ourselves on to consistently deliver exceptional, short time-frame refurbishments. Fortis Vision’s unique in-occupation model has been developed over the past four years with the aim to minimise resident impact whilst delivering a high-quality finish quickly and smoothly, ready for occupation less than 10 hours from the commencement of the works.

The result